The Factory-Fit ERP for Fastener Manufacturing

From Order to Traceable Dispatch.

Every dispatch leaves your factory with complete manufacturing evidence and complete customer confidence.

FIMS ERP gives fastener manufacturers One Trusted Control Thread from customer order to heat-traceable, quality-cleared, GST-ready dispatch — capturing inspection, Heat Number, batch and quality records as production happens. At dispatch, the Dispatch Evidence Package is composed from that same thread. FIMS does not just record the transaction; it preserves the manufacturing truth behind every dispatch.

Book a 30-minute factory-fit session
Batch & heat traceability Automated test certificates QR dispatch labels Audit-ready evidence
EVIDENCE HEAT TREATTHREAD ROLLINSPECTIONPACKINGDISPATCH ORDER IN →
TC-2026-08842 generated16:42:09 · Heat 8842
Heat 8842 → Batch B-1187traceability linked
Evidence package · 9/9 sealeddispatch ready · 16:58
16:42:07 · BATCH B-1187 — QC APPROVED 16:42:09 · TC-2026-08842 GENERATED 16:42:11 · HEAT 8842 LINKED TO BATCH B-1187 16:42:14 · DISPATCH PACKAGE SEALED — 9/9 16:42:31 · QR LABEL PRINTED — DC-2026-1187 16:43:02 · CUSTOMER VERIFIED CERTIFICATE — 4.2s 16:58:00 · TRUCK LR-4471 DEPARTED — EVIDENCE ON BOARD 16:42:07 · BATCH B-1187 — QC APPROVED 16:42:09 · TC-2026-08842 GENERATED 16:42:11 · HEAT 8842 LINKED TO BATCH B-1187 16:42:14 · DISPATCH PACKAGE SEALED — 9/9 16:42:31 · QR LABEL PRINTED — DC-2026-1187 16:43:02 · CUSTOMER VERIFIED CERTIFICATE — 4.2s 16:58:00 · TRUCK LR-4471 DEPARTED — EVIDENCE ON BOARD
10+
Years on
fastener
shop floors

FIMS wasn't designed in a boardroom. It was built and refined on fastener shop floors — across more than a decade of real heats, real test certificates, and real dispatches. Purpose-built for fastener manufacturers — bolts, nuts, screws and made-to-order industrial fasteners — not adapted from a generic ERP.

01 · The 4:30 PM Problem

The question every factory dreads.

4:30 PM. The phone rings. A customer asks about today's dispatch. Easy.

Then comes the second question — “Can you also send the Test Certificate?”

And the search begins. Across inboxes, spreadsheets, registers and godown shelves.

16:00
Incoming call · Customer
K
Apex Mobility Components · Pune
● ringing…
16:30 IST
“Can you send today's dispatch?”
16:30
“Can you also send the Test Certificate?”
16:31
QC · Stores · Dispatch begin searching…
Time spent searching
00:00
Inbox — “TC” search
Searching…
TC_final_v7_FINAL.xlsx
Opening…
Inspection register
Aisle 3…
QC WhatsApp group
Asking…
Godown cabinet B
Digging…
Customer spec — which rev?
Checking…
DISPATCH DELAYED

The dispatch left. The evidence didn't.

It's not a people problem. It's a missing thread. See the thread →

02 · The Manufacturing Journey

Eight stages. One record.

Follow an order through your factory. At every stage, FIMS captures the evidence — automatically.

01

Customer Order

03 · One Trusted Control Thread

Every department. One source of truth.

Sales, planning, purchase, production, QC, stores, dispatch, accounts — all writing to the same living record: the Manufacturing Truth of your factory. No copies. No version conflicts. No gaps.

ORDER IN EVIDENCE OUT
The Thread
WritesOne living record, from the first enquiry to the final invoice.
ReadsHover a department to see what it contributes.
04 · Test Certificate Automation ⭐

Inspection ends. The certificate is already written.

FIMS builds the test certificate from actual inspection results — linked to batch, linked to heat. Approved in QC. Ready before dispatch. No typing. No re-typing. No “we'll email it tomorrow.”

Inspection completedReadings captured at the station. Waiting
QC approvedReviewed against standard. Approved in-system. Waiting
System generates Test CertificateYour format. Your standards. Real values. Waiting
Certificate linked to BatchB-1187 — inseparable from its record. Waiting
Certificate linked to Heat NumberHeat 8842 — chemistry and process attached. Waiting
Ready before dispatchThe truck never waits for paper. Waiting
READY BEFORE DISPATCH
DOOZIE FASTENERS PVT. LTD. Precision Fasteners · Plot 12, MIDC Phase II, Pune, Maharashtra GSTIN 22AABCA1234F1Z9 · ISO 9001:2015 TC NO. TC-2026-08842 23 JUL 2026 · 16:42 CERTIFICATE OF TEST Original — Customer Copy CUSTOMERPO NO.CHALLAN NO. BATCH NO.HEAT NO.QUANTITY GRADESIZESPEC Apex Mobility ComponentsAMC-PO-4471DC-2026-1187 B-118788421,000 pcs Grade 8.8M12 × 60 Hex BoltDIN 933 / IS 1363 MECHANICAL PROPERTIES PROPERTYSTANDARDACTUALRESULT Tensile Strength≥ 800 MPa842 MPaPASS Yield Strength≥ 640 MPa668 MPaPASS Elongation≥ 12 %14.1 %PASS Hardness (HRC)22–3227PASS Decarburization≤ 0.015 mm0.008 mmPASS CHEMICAL COMPOSITION (%) CMNSISP 0.380.820.210.0180.022 Tested on 25T UTM · Rockwell HR-320 · Instruments calibrated 12 Jul 2026 We certify that the material supplied conforms to the specified standard, and the results above are true test records of the batch supplied against this challan. R. Deshmukh — QC Incharge 23 JUL 2026 · 16:42 IST For DOOZIE FASTENERS PVT. LTD. Authorised Signatory QC PASSED 23·JUL·2026 SCAN TO VERIFY fims.link/v/8842 SYSTEM GENERATED BY FIMS ERP · LINKED TO BATCH B-1187 · HEAT 8842
05 · The Dispatch Evidence Package ⭐

Every dispatch leaves with complete manufacturing evidence.

Nine documents and records, assembled automatically and sealed to the shipment. Hand the driver the package — or the QR.

FIMS · EVIDENCE ON BOARD 9/9 EVIDENCE SEALED
Invoice
Delivery Challan
Dispatch Label
Test Certificate
QC Record
Heat Number
Batch Traceability
Material Information
GST Documents
0 / 9
documents attached
06 · QR Dispatch Labels

The label answers the customer's questions.

Print. Scan. Verify. Full batch history, test certificate and QC record — in your customer's hand in seconds.

DISPATCH LABEL DOOZIE FASTENERS PVT. LTD. · PUNE WORKS BATCH B-1187 HEAT 8842 GRADE 8.8 QTY 1,000 PCS SCAN FOR FULL MANUFACTURING HISTORY LR-4471 · DC-2026-1187 · 23 JUL 2026
16:59FIMS VERIFY▮▮▮

Point camera at the label QR

instant verification · no app

BATCH B-1187
ItemM12 × 60 Hex Bolt
Grade8.8 · DIN 933
Heat8842
Quantity1,000 pcs
✓ DISPATCHED · 16:58
CERTIFICATE OF TEST
TC-2026-08842
Tensile842 MPa
Yield668 MPa
Hardness27 HRC
QC QC PASSED
View Download
QC RECORD
Dimensions — within tolerance
Tensile & yield — passed
Hardness — 229 HB
Visual & surface — clean
Approved · R. Deshmukh · 16:42
MANUFACTURING HISTORY
Order confirmed
09:12
Heat 8842 rod issued
11:40 · Stores
Headed · rolled · HT
14:05 · Line 2
Inspection passed
15:20 · TC generated
Dispatched · QR live
16:58 · LR-4471
Verified in 4.2 seconds
Print Label Scan QR Open Batch Open Test Certificate Open QC Record Open Manufacturing History

Works on any smartphone. No app required. No login for customers.

07 · Customer Outcomes

What changes when evidence is automatic.

0%
Faster dispatch documentation

Evidence assembles itself while production runs. Ready before the truck arrives.

0 sec
Certificate response time

From customer call to certificate in their inbox. Not three days.

0%
Shipments evidence-ready

Every dispatch leaves with its full package. No partial dispatches. Ever.

0 min
Audit retrieval time

Any batch. Any heat. Any year. Produced before the auditor finishes their chai.

0 chain
Complete traceability

Heat → batch → dispatch → customer. One unbroken chain, by design.

0
Chase-ups after dispatch

OEM confidence built into every label. The evidence speaks before you do.

08 · Why Manufacturers Choose FIMS

Traditional ERP stops at the invoice. FIMS goes to the customer.

Traditional ERPBuilt for finance & inventory
FIMS ERPBuilt for the factory floor
09 · The Product, Screen by Screen

The same thread, on every screen.

Sales to dispatch, every module reads and writes the one manufacturing record. These frames carry live captures from the golden demo company.

Live screenshots · captured from the FIMS golden demo · Doozie Fasteners Pvt. Ltd.

10 · Customer Confidence

Evidence is how trust ships.

A customer who can scan a label and see the heat, the test certificate and the full manufacturing history doesn't just accept the delivery — they place the next order. Here's what that confidence is built on.

10+ yrs
Manufacturing experience

Refined on fastener shop floors — not designed in a boardroom.

HeatCustomer
Manufacturing expertise

Native heat & batch traceability, built by people who run the process.

Factory-Fit
Implementation

Mapped to your process, batch coding and certificate format — before go-live.

9 / 9
Manufacturing evidence

Every dispatch leaves with its full evidence package, sealed.

From the shop floors we serve
Reserved
Customer logos

For the manufacturers shipping with FIMS.

Reserved
Testimonials

In the words of plant heads — no names invented.

Reserved
Success stories

From the first factory-fit pilot cohort.

11 · The Factory-Fit Session

See FIMS on your factory floor.

45 minutes. Your product, your process, a live configured demo. Walk out knowing exactly what evidence-ready dispatch means for your plant.

01
Understand Factory

We walk your floor — melt to dispatch — and note where evidence is created, and where it's lost.

02
Map Process

Your order-to-dispatch flow, stage by stage, with inspection points and document outputs.

03
Configure Demo

A live FIMS environment with your items, your batch coding and your certificate format.

04
Show ROI

Dispatch delays, certificate turnaround, audit prep — measured against your current numbers.

No slides. No generic demo. Your factory, in FIMS. · factoryfit@dooziesoft.com

Request Demo Talk to an Expert

Pick a slot

45 min · Free
Day
Time · IST
Select a day and time above.

On-site or video · No obligation · Your data stays yours

12 · Questions From The Shop Floor

Asked by every plant head.